Industry Insights · 3 min read

How Biogas Companies Can Use Video to Explain Complex Projects

How to turn a technical project into an explanation that funders, planners and communities can follow.

Seven Media · Updated 20 September 2026

The hardest part of explaining a biogas project is not the technology, it is deciding how much of it the viewer actually needs. An explanation built for an engineer will lose a planning committee, and an explanation built for the public will frustrate an investor. This is how we structure technical films so they stay accurate without becoming unwatchable.

Choose one audience per film

Write down who the film is for and what they need to be able to do afterwards: approve, invest, support, or simply stop worrying about it. That single decision sets the level of technical detail.

If several audiences genuinely need covering, produce separate edits from the same shoot rather than one long compromise.

Structure the explanation

Input, process, output, benefit. Most biogas projects follow that shape, and viewers follow it easily because each stage answers the question the previous one raised.

Give the whole picture before any detail. A thirty second overview of what the site does buys you the attention to explain how a single stage works.

Use consistent language throughout. Switching between feedstock, waste and input in the same film quietly makes the process sound more complicated than it is.

Show the process rather than narrating it

Footage of the actual plant beats animation for credibility, because it proves the thing exists and works. Animation earns its place only where the process is genuinely invisible, such as what happens inside a digester.

Scale is worth filming deliberately. Wide shots that place equipment against people or vehicles communicate the size of an installation faster than a specification ever will.

Put the right people on camera

The person who does the work is usually more convincing than the person who manages it. Engineers and site teams explain their own subject with a precision that is hard to script.

Prepare contributors with the questions in advance and film short, single point answers. Those cut cleanly into the main film and stand alone as individual clips afterwards.

Who is actually watching, in the UK and Europe

A planning committee, a local objector, a lender and a feedstock supplier all need the same project explained differently, and in this sector all four may be watching the same film because it is the only one that exists.

Regulation is the part that does not travel. Permitting, grid injection standards and the support available differ by country, so a film that leans on one national scheme dates quickly and confuses anyone outside it. Explain the process, and keep the scheme-specific detail to the page around the film where it is cheap to update.

Where a project has European partners or investors, subtitles are not a nicety. They are how most of that audience will watch it.

How we approach it

We plan the explanation with the technical team before the shoot, then film on site so the footage carries the detail rather than the voiceover.

The How to Build Biogas Sites A to Z series with Constructioncrew Limited was built that way, following real construction work rather than illustrating it after the fact. Our corporate video page covers the format, and the renewable energy page covers the sector.

Related services

Sector experience: Biogas & Anaerobic Digestion